Vesteys Tank Darwin High School

Attraction
Vestey’s Tank with later roof to form gymnasium.
Tank internal area with shade cloth.
Detail of wall with later additions (roof, windows, door).
Now an indoor basketball court
Interior of the tank showing original walls of the water tank, spiral stairs and new roof.
Gallery showing 5 of 5 images

About

The Tank was originally constructed as a water storage facility for the Vestey Meatworks. The Tank has since been converted into an undercover gymnasium and open air auditorium and assembly area at Darwin High School.The site is in good overall condition and appears well maintained. The site is within the grounds of Darwin High School and not generally open to the public although it is possible to walk around the site most days.

Get in touch

Where you'll be

10 Atkins Drive

Darwin NT 0820